Right Menu
See Other Projects    
EMERALD PARK
Leela Nagar
Structure:

Framed structure with RCC footings with columns and beams


Plastering:

half inch of sand and cement plastering and wall putty


Painting:

premium emultion & paints


Polishing:

polish for main door


Flooring:

premium vertified tiles


Counter wash basin:

granite counter & stainless steel wash basin


Toilet:

parryware Indian at common and European wall mounted closet at attached with 7 ft glassed tiles


Main Door:

Fully teak wood panelled


Door:

Video door calling phone


Other Doors:

water proof flush doors


Windows:

wooden frame with galzed window


Kitchen:

spacious with 4' glassed tiles from counter


Electrical:

orbit wires with modular switch and adequate points video door phone and invertor provision


Plumbing:

premium health faucet from parryware or equivalent


Lift:

5 passenger lift




Floor 01


Floor 02
www.map-embed.com

  • A premium budget apartment in East Tambaram

  • Breath taking structure and design for a 6 units apartment

  • Emerald park meets the need of educational needs for children
  • 1 km from Tambaram railway station and 10 minutes from airport

  • Well connected to all mode of transports

Coming Soon






  • 20% At the time of Agreement (within 15days of Booking)
  • 30% At the time of Registration (Registration should be made within 30 days from the date of Agreement)
  • 10%  On Completion of Ground.Stilt Roof Slab
  • 5%    On completion Flat