Right Menu
See Other Projects    
VISTA VALLEY
Karnam Street
Structure:

Framed structure with RCC footings with columns and beams


Plastering:

half inch of sand and cement plastering and wall putty


Painting:

premium emultion & paints


Polishing:

polish for main door


Flooring:

premium vertified tiles


Counter wash basin:

granite counter & stainless steel wash basin


Toilet:

parryware Indian at common and European wall mounted closet at attached with 7 ft glassed tiles


Main Door:

Fully teak wood panelled


Other Doors:

water proof flush doors


Windows:

country wood


Kitchen:

spacious with 4' glassed tiles from counter


Electrical:

orbit wires with modular switch and adequate points video door phone and invertor provision


Plumbing:

premium health faucet from parryware or equivalent


Lift:

not provided




Floor 01


Floor 02
www.map-embed.com

  • TRUE VALLEY @ SELAIYUR KARNAM STREET

  • 8 UNIT APPARTMENTS WITH AMPLE SPACE

  • HI TECH STRUCTUREING

  • BREATH EASY AND ECO FRINDLY APPATMENT

  • FREE AIR FLOWING CORNER PLOT

  • ALL COVERED CAR PARKING

Coming Soon






  • 20% At the time of Agreement (within 15days of Booking)
  • 30% At the time of Registration (Registration should be made within 30 days from the date of Agreement)
  • 10%  On Completion of Ground.Stilt Roof Slab
  • 5%    On completion Flat